Field-Proven Work

Projects & Case Studies

Documented outcomes from turbine overhauls, precision reverse engineering, greenfield commissioning, and diagnostic jobs — across sugar mills, power plants, paper mills, steel plants, and cement factories.

8

Documented Case Studies

500+

Turbines Serviced

38+

Years Experience

24/7

Emergency Response

Filter by serviceService:
Filter by industryIndustry:
OverhaulingSugar Mill

Triveni 5 MW Back-Pressure Turbine — Full Overhaul & Rotor Balance

202312 days

Complete turnkey overhaul: rotor removal, bearing replacement, labyrinth seal machining, rotor dynamic balancing (ISO 1940 G2.5), lube oil flushing, and commissioning.

Vibration reduced from 6.4 mm/s to 1.8 mm/s

TriveniRotor BalancingBabbitt BearingsOverhaul
Read Case Study
Reverse EngineeringPaper Mill

Siemens SST-200 Impulse Stage Disc — Reverse Engineering & Manufacture

202321 days

3D laser scan of damaged impulse disc, PMI material verification, full manufacturing drawing set, and supply of replacement disc machined to drawing.

Lead time cut from 14 weeks (OEM) to 21 days

SiemensReverse Engineering3D ScanPMI
Read Case Study
Erection & CommissioningDistillery

Maxwatt 3.5 MW Co-Gen Turbine — Greenfield Erection & Commissioning

202228 days

Complete erection of steam turbine, gearbox, alternator, condenser, lube oil system, and all associated piping and cable work. OEM witness commissioning.

First synchronisation achieved on commissioning day — no punch-list delays

MaxwattErectionCommissioningAlignment
Read Case Study
Lube Oil FlushingPower Generation

BHEL 15 MW Extraction-Condensing Turbine — Post-Overhaul Lube Oil Flush

20245 days

Post-overhaul lube oil system flushing using mobile centrifuge filter unit. Target cleanliness: ISO 4406 ≤16/14/11 for main lube oil circuit and ≤15/13/10 for control oil circuit.

Main lube oil circuit: ISO 4406 15/13/10 ✓

BHELLube Oil FlushingISO 4406Power Generation
Read Case Study
Machine AlignmentSteel Plant

KKK Compressor-Gearbox-Motor Train — Precision Laser Alignment

20242 days

Precision laser alignment of a three-element compressor train (motor–gearbox–compressor) following gearbox replacement. Pipe strain measurement and correction.

Angular misalignment: 0.008 mm/100 mm (OEM limit 0.02 mm/100 mm)

KKKLaser AlignmentCompressorSteel Plant
Read Case Study
Dynamic BalancingCement Plant

Cement Mill Fan Rotor — Dynamic Balancing & Journal Machining

20234 days

Workshop dynamic balancing of a 680 kg ID fan rotor to ISO 21940-11 G2.5 quality grade, plus journal grinding and polishing on both drive-end and non-drive-end journals.

Residual imbalance: 6 g·mm/plane — better than G1.0

Dynamic BalancingFan RotorJournal MachiningCement
Read Case Study
Emergency BreakdownSugar Mill

Belliss & Morcom Turbine — Emergency Babbitt Bearing Failure During Crushing Season

202414 hours downtime

Emergency site response, root-cause diagnosis, replacement babbitt bearing manufacture and fit, rotor inspection, and recommissioning within a 14-hour window.

Total downtime: 14 hours from trip to first steam

Belliss & MorcomEmergencyBabbitt BearingSugar Mill
Read Case Study
TroubleshootingPaper Mill

BHEL 3 MW Turbine — High Vibration Root-Cause Investigation & Correction

20243 days investigation + 8 days correction

On-site vibration analysis, rotor-dynamic assessment, root-cause identification, workshop rotor balancing, bearing replacement, and recommissioning.

Vibration reduced from 9.2 mm/s to 0.8 mm/s at operating speed

BHELVibration AnalysisDynamic BalancingTroubleshooting
Read Case Study

Have a similar challenge?

Talk to Our Engineers Directly

Describe your turbine make, site conditions, and shutdown window — our ex-OEM engineers will give you a straight answer on scope and timeline.